home labs calender projects resources

Laboratory Assignments

lab group assignments
Lab Assignment 1 collected on 13 June 2012
Lab Assignment 2 collected on 13 June 2012
Lab Assignment 3 collected on 23 July 2012

Laboratory Projects

project team assignments
Project 1: 5.8 GHz Sig Gen report and verification by 25 July 2012
Project 2: 5.8 GHz Power Amp report and verification by 25 July 2012
Project 3: 5.8 GHz Collector report and verification by 25 July 2012

2009-present Georgia Tech -- all rights reserved