home
labs
calender
projects
resources
Laboratory Assignments
lab group assignments
Lab Assignment 1
collected on 13 June 2012
Lab Assignment 2
collected on 13 June 2012
Lab Assignment 3
collected on 23 July 2012
Laboratory Projects
project team assignments
peer evaluations
Project 1: 5.8 GHz Sig Gen
report and verification by 25 July 2012
Project 2: 5.8 GHz Power Amp
report and verification by 25 July 2012
Project 3: 5.8 GHz Collector
report and verification by 25 July 2012
2009-present Georgia Tech -- all rights reserved