Kauto Engineering Main Page
KUATO ENGINEERING
 
 
 
 
 
 
 
 

 

 
 
 
Budget
 
 
Cost Breakdown
 
 

 
Unit Cost
Units
Subtotal
Satellite [3]
$80,000,000/satellite
15 satellites
$1,200,000,000
Launch [2]
$205,400,000/launch
5 launches
$1,027,000,000
People
$3,950,000/year
4 years
$15,800,000
Management
$500,000/year
4 years
$2,000,000
Subtotal    
$2,244,800,000
Overhead
40%
$897,920,000
Total    
$3,142,720,000
 
 


The detail for people cost per year is given below: [1]

Tasks/Positions
Unit Cost (per year)
Units
Subtotal
Communication System  
 
  RF Engineers $89,000
8
$712,000
  Electrical Engineers $75,000
4
$300,000
Location System  
 
  Electrical Engineers $72,000
4
$288,000
  Computer Engineers $80,000
2
$160,000
  Software Engineers $84,000
3
$252,000
  Programmers $70,000
6
$420,000
Satellite  
 
  Aerospace Engineers $76,000
4
$304,000
  Electrical Engineers $75,000
2
$150,000
  Mechanical Engineers $70,000
2
$140,000
  Material Engineers $80,000
4
$320,000
Orbital Mechanics & Propulsion System  
 
  Aerospace Engineers $76,000
4
$304,000
Manager $100,000
6
$600,000
Total
 
49
$3,950,000

 


 
 

Timeline

 
 


The total estimated timeline for MPS Satellites construction is three years from planning to actually design the MPS satellites. Three satellites can be launched together in one Atlas V launch. Each launch takes about 300 days to reach Mars and start orbiting about Mars. Once all MPS satellites are in place, the set up and testing on Mars can begin and last about one month. The MPS system will be fully functional on September, 2012 which is four years from the beginning.

The detailed schedule which was created with Gantt chart can be found by clicking here.

 
 
 
 

References

[1] "Engineer Salary Calculator", [Online] Available: http://www.engineersalary.com/

[2] "Atlas V Specification", [Online] Available: http://www.spaceandtech.com/spacedata/elvs/atlas5_specs.shtml

[3] "NAVSTAR GLOBAL POSITIONING SYSTEM (GPS)", [Online] Available: http://www.globalsecurity.org/military/library/budget/fy1999/dot-e/airforce/99gps.html